Citrix CCEA XP 1Y0-259 試験
CCEA XP認証の方案はIT専門人員にもっと効率的に問題を解決する能力を備えさせます、その着眼点は取引先の実際の要求にあって、いくつかの具体的な製品の特性ではありません。ITマネージャー達もこの方案が持ってくるサービスの質と社員の生産効率を上げることから利益を収穫できます。以下は1Y0-259の問題集でございますみんなと一緒に勉強しましょう
1.Which step is required to obtain the license file when implementing Citrix Presentation Server
4.5 after installing the Citrix License Server?
A.Download the license file from MyCitrix.com and upload it to the License Management Console through
the License Files node.
B.Download the license file from MyCitrix.com and upload it to the License Management Console through
the File Locations node.
C.Download the license code from MyCitrix.com and enter it in the License Management Console through
the License Files node.
D.Download the license code from MyCitrix.com and enter it in the License Management Console through
the File Locations node.
Correct:A
2.Scenario: An administrator is installing Presentation Server 4.5. The company requires the use
of the Program Neighborhood Agent as the pass-through client and that users should be explicitly
prompted for authentication to Citrix Presentation Server. Which two steps must the administrator
take during the installation to meet the company’s requirements? (Choose two.)
A.Select “no” for pass-through authentication for the pass-through client.
B.Select “yes” for pass-through authentication for the pass-through client.
C.Replace the default Client with the Program Neighborhood Agent as the pass-through client.
D.Specify the URLs of the web server running the Program Neighborhood Agent Services Site.
Correct:A D
3.Scenario: A company has a Citrix Presentation Server 4.0 on Windows Server 2003
implementation and will upgrade to Citrix Presentation Server 4.5. The administrator must migrate
the current farm while preserving the current custom configuration settings. Which type of
installation should the administrator follow?
A.The automatic upgrade path, choosing custom settings in the autorun installations
B.The automatic upgrade path, accepting the default settings in the autorun installations
C.The phased migration path, joining a server running Citrix Presentation Server 4.5 on Windows Server
2003 to the current farm and acquiring the configuration settings
D.The phased migration path, installing Citrix Presentation Server 4.5 on a server running on Windows
Server 2003 independent of the current farm and manually configuring the custom settings
Correct:B
4.Scenario: When planning a Presentation Server deployment on multiple servers, an organization
wants to ensure that there is no Presentation Server as a single point of failure. Which three
database options eliminate the single point of failure? (Choose three.)
A.Oracle
B.IBM DB2
C.Microsoft Access
D.Microsoft SQL Server
E.Microsoft SQL Express
Correct:A B D